Floor panel construction method - List of Manufacturers, Suppliers, Companies and Products

Floor panel construction method Product List

1~2 item / All 2 items

Displayed results

A must-see for contractors and builders who want to reduce their workload! Floor panel construction method.

Due to the large-scale reduction in construction, work time has been reduced by about 50%! Since only one steel post is installed for each floor panel, it can be constructed by someone other than a carpenter.

The "Floor Panel System" is a construction method that utilizes integrated floor panels made of structural plywood, structural LVL, and insulation materials, allowing for reduced construction time and high insulation performance. Installation is simple, requiring only one steel post per floor panel. The components that create thermal bridges under the floor are minimized, resulting in high insulation effectiveness. Since there is no need for additional framing or connections, significant reductions in work time can be achieved, contributing to reduced fatigue and lower risk of injury. 【Features】 ■ Approximately 20% reduction in the amount of insulation material used for the floor (based on our calculations) ■ Approximately 50% reduction in construction time (based on our tests) ■ Minimal on-site processing, reducing the burden of waste disposal costs *For more details, please refer to the materials available for download under "Download Catalog." Feel free to contact us with any inquiries.

  • Other flooring materials
  • Floor panel construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

大引レスで床の省施工かつ高断熱な床工法。断熱性能の義務化も安心

⼤引きと根太が無いため、⼤引きを跨いだりする際のケガや疲労が軽減。床の省施工が専門的な知識なしで大工などの職人以外でも設置可能に

『床パネルシステム』は、構造用合板、構造用LVL、断熱材を 一体化した床パネルを用いた省施工・高断熱の床工法です。 床パネル1枚につき、鋼製束を1本取り付けるだけの簡単施工。 床下の熱橋となる部材が小さいため、高い断熱性を発揮できます。 大引き、大引き繋ぎなどの施工が不要なため、 作業時間の大幅短縮が図れるほか、疲労軽減など、ケガのリスク低減にも貢献します。 【特長】 ■床の断熱材の使用量を約20%削減可能 (当社試算に基づく) ■施工時間の約50%短縮を実現 (当社テストに基づく) ■現場での加工が少なく、廃材の処理コストの負担を軽減 ※詳しくは「カタログをダウンロード」より資料をご覧ください。お問い合わせもお気軽にどうぞ。

  • Other flooring materials
  • Heat insulation and heat shielding methods
  • Floor panel construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration